Question:

what order do the steel washer and the 2 o rings go on the bolt? My guess is that the steel washer goes on, and then an o ring, and then the actual foot pad, and then another o ring? And how tight should the bolt be in ft lbs? Thanks!

0

Expert Reply:

The replacement Foot Pad for Lippert Hydraulic Ground Control Leveling System - Qty 1 # LC324269 needs to be torqued to 132 ft-lb and Lippert recommends using some Loctite Threadlocker 262 - High Strength - Up to 3/4" Nuts/Bolts - 0.20-Fl-Oz Tube Item # LT37420 to prevent the bolt from loosening. You are correct with the placement of the washer and o-rings.

expert reply by:
0
Kevin C

Products Referenced in This Question


Product Page this Question was Asked From


Q & A Icon

Continue Researching

See More Q&A Expert Answers >>

^

Recently Viewed Products

About Us
photos and videos
1,056,204
Original Photos & Videos

Produced to make sure you know what you are getting and you get exactly what you need.

installations
35,570
Installations Completed

To make sure products work and fit the way they are supposed to.

etrailer call center
2,476,511
Phone Calls & Emails Answered

1,125,924 phone calls and 1,350,587 emails to help find the right solution.

etrailer training
400+
Average Hours of Product Training

We get to know our products firsthand so experts can better help you.

etrailer service
78
Years of Quality Customer Service

Assisting our neighbors and customers, face to face at the counter.

etrailer experts
193,357
Pages of Expert Information

Created to make sure you have all the answers to your questions, from real experts.